Projects

  • 20140309_130758

    William Landing Pedestrian Bridge

    Supply, fabrication, surface treatment: Williams Landing Pedestrian Bridge spanning 100 meters.  

  • 012

    Eastern Plaza

    Eastern Plaza was the first Stage in the Melbourne Park Tennis Centre redevelopment. GVP’s scope consisted of construction of the main stadium housing 8 internal courts, all external feature façade mullions, external elevated walkways linking the area to the MCG link bridge and the main carpark bellow the main structure together with the pedestrian link […]

  • PB130142

    699 Bourke Street

    699 Bourke Street project was a 8 story composite slab office tower constructed above Southern Cross Railway Station. GVP’s scope included construction of the lift over run framing, main structural crash barriers, north entry pavilion, 8 levels of structural floor framing including bondeck and shear studs, level 4 carpark and the south entry pavilion.

  • 22-12-2015 12-22-18 PM

    RMIT Swanston Academic Building

    Transfer truss and Composite structure Façade steelwork Roof Steelwork Design and Construct canopies and Atrium Screen structures

  • Photograph 18 - Construction of south cantilever and east facade truss with 50m cantilever

    Melbourne Convention Centre

    GVP was contracted to provide all the structural steelwork for the new Convention Centre. This included the new Plenary Hall and the Hilton Hotel.

  • Melbourne's new rectangular stadium in construction.

    Melbourne Rectangular Stadium

    GVP has been contracted to fabricate and paint & deliver 8 of the roof shells.

  • Photo 2a

    888 Collins Street

    Supply, Fabrication, Surface Treatment, Delivery and Erection of Structural Steelwork; Including: Link Bridges Canopy Frames Crash Barriers

Powered by WordPress. Designed by WooThemes