Past Projects
-

Rialto Plaza Regeneration
Supply, Fabrication, Surface Treatment, Delivery and Erection of Structural Steelwork: Design of temporary works Full refurbishment and revamp of the Rialto ground floor plaza. Refurbishment Rialto Podium office Modifications to the existing car park to accommodate new lifts and entry point to existing Rialto towers Project Management
-

Surdex Warehouse Extension at Dandenong
Supply, fabrication, shop detailing, surface treatment, delivery, and erection of steelwork and purlins/girts for Surdex Warehouse Extension at Dandenong. Supply and delivery of holding down bolts. Supply and delivery of all galvanized steel packers for footings Fabrication of Structural Steel – Beams, Columns, Gantry crane beams Project Management
-

Riverside Quay
Supply, fabrication, shop detailing, surface treatment, delivery, and erection of steelwork and purlins/girts East Elevation on section 7 and addendum 24, Item #1 Canopy at south east corner on level 4 Canopy at west evelvation on level 1 Roof at north east corner and small roof at north west on level 3 Steel column supporting […]
-

567 Collins Street
567 Collins Street is a 28 level office tower structure. GVP’s scope included the main entry raking columns, level 3 composite slab structure façade support steel work, internal plant rooms, roof feature cladding structure, and ground level retail pods structure.
-

Southern Cross Redevelopment
This is a forty level steel structure consisting of approximately 6,000tonnes of structural steel. GVP completed fabrication of this over a 16-month period. GVP also supplied and installed the condek and sheer studs on this project.
-

Margaret Court
Margret Court Expansion was stage 2 in the Melbourne Park Tennis Centre redevelopment. GVP’s scope consisted of construction of the main stadium including the main roof support truss system, retractable roof structure, main roof structure, feature façade mullions and secondary steel support structure.
-

EastLink Bridges
GVP was contracted to supply 5 large steel bridges for the EastLink project. Two of the bridges being Princes Highway and Cheltenham Road were completed two months ahead of schedule. The bridges for Heatherton Road and Ringwood Railway Bridge were completed on program.
-

William Landing Pedestrian Bridge
Supply, fabrication, surface treatment: Williams Landing Pedestrian Bridge spanning 100 meters.
-

Eastern Plaza
Eastern Plaza was the first Stage in the Melbourne Park Tennis Centre redevelopment. GVP’s scope consisted of construction of the main stadium housing 8 internal courts, all external feature façade mullions, external elevated walkways linking the area to the MCG link bridge and the main carpark bellow the main structure together with the pedestrian link […]
-

699 Bourke Street
699 Bourke Street project was a 8 story composite slab office tower constructed above Southern Cross Railway Station. GVP’s scope included construction of the lift over run framing, main structural crash barriers, north entry pavilion, 8 levels of structural floor framing including bondeck and shear studs, level 4 carpark and the south entry pavilion.
