Riverside Quay

Supply, fabrication, shop detailing, surface treatment, delivery, and erection of steelwork and purlins/girts

  • East Elevation on section 7 and addendum 24, Item #1
  • Canopy at south east corner on level 4
  • Canopy at west evelvation on level 1
  • Roof at north east corner and small roof at north west on level 3
  • Steel column supporting stair landing
  • Level 9A steel walkway
  • Ground floor and level 2 steel. (excluding all above mentioned steel)
  • Sections 34 & 35 steel struts
  • Metalwork on Architectural
  • Alimak & Crane access platforms (level 7 & 9)
  • Temporary design for a roof over the east plaza gantry stairs
  • Level 21 roof, plant platform and architectural claws
  • Dismantle and removal of temporary structural steel
  • Project Management

Client

Mirvac Constructions